2級土木施工管理技士学科過去問題/令和7年1次後期~ Android

2級土木施工管理技士学科過去問題/令和7年1次後期~

You can study over 10 years of past questions of the 2nd grade civil engineering construction management department repeatedly on your mobile phone or tablet. This app is suitable for studying for exams and self-study while commuting, and is for people who aim to pass by repeating past exam questions.

Overview

Features & Capabilities

For the 2026 exam.

This app contains past exam questions for the 2nd Grade Civil Engineering Construction Management Engineer (Subject) exam from 2012 to the 2025 (Reiwa 7) first-stage second-half exam.

It's designed for those aiming to pass by repeatedly reviewing past questions.

There are no in-app purchases or advertisements.

Understand the question trends, find your own learning method, and proceed with your studies systematically.

For each question, you can quickly check the answer [Question ⇒ Answer].

The answer page also includes the original question, making it easy to review.

The "Learning Confirmation Test" (R7 second-half to R1) presents 10 questions randomly, allowing you to check your understanding.

Study little by little during your commute on the train or bus, or during breaks.

*This resource includes past exam questions from: 2025 (First Stage, Second Half), 2025 (First Stage, First Half), 2024 (First Stage, Second Half), 2024 (First Stage, First Half), 2023 (First Stage, Second Half), 2023 (First Stage, First Half), 2020 (First Stage, First Half), 2020 (First Stage, Second Half), 2021 (First Stage, First Half), 2020 (Second Half), 2019 (First and Second Half), 2018 (First and Second Half), 2017 (First and Second Half), 2016, 2015, 2014, 2013, and 2012.

One of the most important things for obtaining a qualification is repeatedly reviewing past exam questions.

By repeatedly reviewing past questions, you can understand the structure of the questions, the types of questions that tend to appear, and your own strengths and weaknesses. This allows you to create an exam preparation plan and study strategy, determining which areas to focus on and where to earn points.

Find your own study method and proceed with your studies systematically.

*The diagram in question No. 2 of the 2025 1st Stage (Second Half) exam is displayed horizontally due to display limitations.

2024 1st Stage (Second Half) Question [No. 1]
Using the symbols in the schematic diagram representing the soil composition shown below, which of the following formulas is correct for calculating the "water content w"?

2024 1st Stage (Second Half) Question [No. 2]
Which of the following combinations of terms is appropriate for the particle size classifications (a) to (d) of the soil particles shown below?
(a) Clay (b) Silt (c) Sand (d) Gravel
2024 1st Stage (Second Half) Question [No. 3]
Which of the following formulas is correct for calculating the maximum bending moment M generated when a concentrated load P acts on the simply supported beam shown below?
However, the self-weight of the beam is not considered.
Reiwa 6th Year, First Stage (Second Semester) Question [No. 4]
Regarding the centroid G of the inverted T-shaped cross-section figure shown below, which of the following formulas is correct for finding the height h from the X-axis?
Assume that the density and thickness of the figure are uniform. Also, the figure is an image.
h = 3a
Reiwa 6th Year, First Stage (Second Semester) Question [No. 5]
In Bernoulli's theorem for the ideal fluid shown below, which of the following combinations of head names is appropriate?
Assume that the density of water is ρ, the acceleration due to gravity is g, the average flow velocities in cross-sections ① and ② are v₁ and v₂, the pressure strength is p₁ and p₂, and the heights from the reference plane to the center of flow in cross-sections ① and ② are z₁ and z₂, taking one horizontal plane as a reference.
(a) Speed ​​(b) Pressure (c) Position
Reiwa 6th Year, 1st Stage (Second Half) Question [No. 6]
Which of the following combinations regarding the "type" and "machinery used" of earthwork is incorrect?
[Type] Compaction [Machinery Used] Dragline
Reiwa 6th Year, 1st Stage (Second Half) Question [No. 7]
Which of the following combinations regarding the "type of work" and "purpose" of slope protection work is incorrect?
[Type of Work] Turfing [Purpose] Prevention of collapse of landslide masses
Reiwa 6th Year, 1st Stage (Second Half) Question [No. 8]
Which of the following descriptions regarding desirable conditions for embankment material is incorrect?
High compressibility after compaction, ensuring the stability of the embankment.
Reiwa 6th Year, 1st Stage (Second Half) Question [No. 9]
Which of the following countermeasures for soft ground corresponds to a compaction method?

Vibroflotation Method
FY2024 1st Stage (Second Half) Question [No. 10]
Which of the following statements regarding admixtures used in concrete is incorrect?
Blast furnace slab fine powder can suppress the occurrence of cracks due to concrete shrinkage.
FY2024 1st Stage (Second Half) Question [No. 11]
Which of the following statements regarding the slump test of concrete is correct?
Slump is expressed in units of 0.5 cm.
FY2024 1st Stage (Second Half) Question [No. 12]
Which of the following statements regarding various types of concrete is correct?
For placing concrete underwater, a tremie pipe or concrete pump is used as a general rule to prevent material separation in still water.
FY2024 1st Stage (Second Half) Question [No. 13]
Which of the following statements regarding concrete curing is incorrect?
The wet curing period for mixed cement should be shorter than that for ordinary Poldland cement.
FY2024 1st Stage (Second Half) Question [No. 14]
Which of the following descriptions regarding the characteristics of pile driving machines for precast pile construction is incorrect?
Diesel hammers produce no noise, vibration, or oil splatter, and have high impact force.

FY2024 1st Stage (Second Half) Question [No. 15]
Which of the following combinations regarding the "construction method name" and "main materials and equipment" used for cast-in-place concrete piles is incorrect?
[Construction Method Name] All-casing method [Main Materials and Equipment] Stabilizing fluid (bentonite slurry)
FY2024 1st Stage (Second Half) Question [No. 16]
Which of the following descriptions regarding the construction of earth retaining walls is incorrect?
Self-supporting earth retaining wall construction is a method that uses shoring.

FY2024 1st Stage (Second Half) Question [No. 17]
Which of the following descriptions regarding steel materials is incorrect?

Wire cables, made by bundling hardened steel wires, are used in the assembly of reinforcing bars and gabions.

Reiwa 6th Year, 1st Stage (Second Half), Question [No. 18]
Which of the following descriptions regarding steel road bridge erection methods is correct?
The cantilever erection method using a traveler crane is a method in which members are suspended by a crane and erected in a cantilevered manner, and is suitable for erecting truss bridges when the space under the girder cannot be used.

Reiwa 6th Year, 1st Stage (Second Half), Question [No. 19]
Which of the following terms regarding concrete does not correspond to a deterioration mechanism?
Cold joint
Reiwa 6th Year, 1st Stage (Second Half), Question [No. 20]
Which of the following descriptions regarding rivers is correct?
In a river, the right side when looking downstream from upstream is called the right bank, and the left side is called the left bank.

Reiwa 6th Year, 1st Stage (Second Half), Question [No. 21]
Which of the following descriptions regarding river revetments is incorrect?

High-water revetments are constructed to protect slopes during high water levels in single-section rivers.

Reiwa 6 (2024) 1st Stage (Late Term) Question [No. 22]
Which of the following is the appropriate general order when constructing a sediment control dam shown in the diagram below on a sedimentary layer of sand and gravel?

Reiwa 6 (2024) 1st Stage (Late Term) Question [No. 23]
Which of the following statements regarding landslide prevention work is incorrect?
A water collection well is a structure that uses a caisson to drain groundwater and is classified as a retaining structure.

Reiwa 6 (2024) 1st Stage (Late Term) Question [No. 24]
Which of the following statements regarding the construction of the road base for asphalt pavement is correct?
Materials such as crushed stone and slag are used for the lower road base.

Reiwa 6 (2024) 1st Stage (Late Term) Question [No. 25]
Which of the following statements regarding compaction in asphalt pavement for roads is correct?

If the compaction temperature is too high, hairline cracks and deformation may occur.

Reiwa 6th Year, 1st Stage (Second Half) Question [No. 26]
Which of the following descriptions regarding various repair methods for asphalt road pavement is correct?
The milling method is a method of removing protrusions, etc., to eliminate steps and unevenness on the road surface.

Reiwa 6th Year, 1st Stage (Second Half) Question [No. 27]
Which of the following descriptions regarding construction considerations for concrete road pavement is incorrect?
In the final finishing of poured concrete, a rough finish should be applied using a broom or brush, etc., before the surface shine disappears.

Reiwa 6th Year, 1st Stage (Second Half) Question [No. 28]
Which of the following descriptions regarding dams is correct?
In Japanese rivers, where the river width is relatively narrow and the flow rate is low, the temporary drainage tunnel method is often used for diversion works of dams.

FY2024 1st Stage (Second Half) Question [No. 29]
Which of the following statements regarding tunnel excavation using the mountain tunneling method is incorrect?
Mechanical excavation has the disadvantage of often resulting in over-excavation.
FY2024 1st Stage (Second Half) Question [No. 30]
The diagram below shows the structure of a sloping coastal embankment. Which of the following combinations of structural names (a) to (c) in the diagram is correct?
(a) Foundation protection work (b) Foundation work (c) Wave-returning work
FY2024 1st Stage (Second Half) Question [No. 31]
Which of the following statements regarding the construction of a caisson-type composite embankment is incorrect?
Generally, a crane ship is used to fill the installed caisson with filling material, increasing its mass and improving its stability.
FY2024 1st Stage (Second Half) Question [No. 32]
Which of the following combinations regarding railway "track terminology" and "explanation" is incorrect?

[Track Terminology] Cant [Explanation] Lowering the outer rail to prevent the vehicle from tipping outwards due to centrifugal force when passing through a curve.
Reiwa 6th Year, 1st Stage (Late Term) Question [No. 33]
Which of the following statements regarding railway operating lines and construction work adjacent thereto is incorrect?
Work using heavy machinery must be carried out while avoiding contact with the train from its approach until its completion of passage.

*While every effort has been made to ensure the accuracy of points and other information within the app, we cannot guarantee its accuracy. Please note this.
We assume no responsibility for any inconvenience or disadvantage caused by the use of this app.

*The content within the app may be added, updated, changed, or modified without notice.

User Growth & Download Statistics

Contact the developer

Chrome-Stats does not own this Android app. Please use these information below to contact the Android app developer.
Developed by:
ソイルプランニング
Google Play Store
https://play.google.com/store/apps/details?id=com.r2dob2sekokan
Email:
so*****@gmail.com

Best 2級土木施工管理技士学科過去問題/令和7年1次後期~ Alternatives

Here are some Android apps that are similar to 2級土木施工管理技士学科過去問題/令和7年1次後期~: