2級建築施工管理技士学科過去問題/令和7年1次後期~H22 Android

2級建築施工管理技士学科過去問題/令和7年1次後期~H22

You can study over 10 years of past questions from the Class 2 Building Construction Management Engineer Department over and over again on your phone or tablet. This app is suitable for studying for exams while commuting, self-studying, and studying past exam questions.

Features & Capabilities

For the 2026 exam.

This app is for those aiming to pass by repeatedly reviewing past exam questions.

There are no in-app purchases and no ads.

Understand the exam trends, find your own learning method, and proceed with your studies systematically.

For each question, you can quickly check the answer [Question ⇒ Answer].

The answer page also includes the original question, making it easy to review.

The "Learning Confirmation Test (R7 Late Term - R1)" presents 10 questions randomly, allowing you to check your understanding.

Study little by little during your commute on the train or bus, or during breaks.

Second half of Reiwa 7 (No. 1-50), First half of Reiwa 7 (No. 1-50), Second half of Reiwa 6 (No. 1-50), First half of Reiwa 6 (No. 1-50), Second half of Reiwa 5 (No. 1-50), First half of Reiwa 5. Next (No. 1 to 50), Second half of Reiwa 4 (No. 1 to 50), First half of Reiwa 4 (No. 1 to 50), Second half of Reiwa 3 (No. 1 to 50), First half of Reiwa 3 (No. 1 to 50), Second half of Reiwa 2 (No. 1 to 50),
Late Reiwa (No. This collection includes questions 1-50 from the following years: Reiwa 1 (2019) first half [No. 1-50], Heisei 30 (2018) second half [No. 1-50], Heisei 30 (2018) first half [No. 1-50], Heisei 29 (2017) second half [No. 1-65] (Category: Architecture), Heisei 28 (2016) [No. 1-65] (Category: Architecture), Heisei 27 (2015) [No. 1-65] (Category: Architecture), Heisei 26 (2014) [No. 1-65] (Category: Architecture), and Heisei 25 (2013) [No. 1-65] (Category: Architecture).

*Questions No. 66-95 for the Category: Structural and Finishing from Heisei 29 (2017) to Heisei 22 (2010) are not included.

One of the important things for obtaining a qualification is to repeatedly review past exam questions.

By repeatedly reviewing past exam questions, you can understand the question structure, the types of questions that appear, and your strengths and weaknesses. This allows you to develop an exam preparation plan, including which areas to focus on and where to earn points.
Find your own learning method and proceed with your studies systematically.
[Example Questions]
Reiwa 6th Year (Second Semester) First Stage Examination Question [No. 1]
Which of the following statements regarding color is the most inappropriate?
A pure color is the color with the highest brightness among all hues.
Reiwa 6th Year (Second Semester) First Stage Examination Question [No. 2]
Which of the following general statements regarding reinforced concrete structures is the most inappropriate?
The spacing of the stirrups in a column is denser in the center than at the top and bottom ends of the column.
Reiwa 6th Year (Second Semester) First Examination Question [No. 3]
When concentrated loads P₁ at point C and P₂ at point D of the simply supported beam AB shown in the figure, which of the following is the correct magnitude of the vertical reaction force generated at support B?
7kN
Reiwa 6th Year (Second Semester) First Examination Question [No. 4]
Which of the following general statements about wood is the most inappropriate?
Sapwood is less susceptible to decay and more resistant to insect damage than heartwood.
Reiwa 6th Year (Second Semester) First Examination Question [No. 5]
Which of the following statements about ventilation is the most inappropriate?
The Type 3 mechanical ventilation system has a fan only on the supply side and can always maintain positive pressure inside compared to the outside air.
Reiwa 6th Year (Second Semester) First Examination Question [No. 6]
Which of the following statements about condensation during winter heating is the most inappropriate?
To prevent surface condensation on the interior side of the exterior wall, the interior surface temperature should be kept below the dew point temperature.
Reiwa 6th Year (Second Semester) First Examination Question [No. 7]
Which of the following general statements regarding steel frame structures is the most inappropriate?
Columns with a smaller slenderness ratio are more prone to buckling.
Reiwa 6th Year (Second Semester) First Examination Question [No. 8]
Fillet welding involves cutting a groove at the end of the base metal and filling it with weld metal to form the welded joint.
Reiwa 6th Year (Second Semester) First Examination Question [No. 9]
Which of the following statements regarding foundation piles is the most inappropriate?
A cast-in-place concrete pile construction method includes a pre-boring enlarged foundation reinforcement method using an earth auger.
Reiwa 6th Year (Second Semester) First Examination Question [No. 10]
Which of the following statements regarding loads and external forces in the structural design of buildings is the most inappropriate?
Wind pressure is calculated by multiplying the wind speed, determined based on past typhoon records in the region, by only the wind pressure coefficient.
Reiwa 6th Year (Second Semester) First Examination Question [No. 11]
Which of the following is the correct bending moment diagram when a concentrated load P acts on point A of the cantilever beam shown in the figure? Assume that the bending moment is drawn on the tension side of the material.

Reiwa 6th Year (Second Semester) First Examination Question [No. 12]
Which of the following statements regarding structural steel is the most inappropriate?
The density is approximately 2.3 g/cm³.

Reiwa 6th Year (Second Semester) First Examination Question [No. 13]
Which of the following statements regarding ceramic tiles specified in the Japanese Industrial Standards (JIS) is the most inappropriate?
There are two types of back-connecting materials for back-connecting unit tiles: one that is peeled off during installation and one that is not.

Reiwa 6th Year (Second Semester) First Examination Question [No. 14]
Which of the following statements regarding the characteristics of sealing materials is the most inappropriate?
Silicone-based sealing materials have poor weather resistance and durability.

Reiwa 6th Year (Second Semester) First Examination Question [No. 15]
Which of the following descriptions regarding asphalt paving work is the most inappropriate?
Prime coat protects the finished surface of the subgrade and improves the adhesion between the subgrade and the base course.
Reiwa 6th Year (Second Semester) First Examination Question [No. 16]
Which of the following combinations of electrical equipment in a building and related terminology is the least related?
Power equipment --- Information outlet
Reiwa 6th Year (Second Semester) First Examination Question [No. 17]
Which of the following descriptions regarding water supply and drainage equipment is the most inappropriate?
The direct-connection, direct-pressure water supply system directly connects a pressure boosting water supply device to the water service pipe branched from the main water pipe, supplying water to various parts of the building.
Reiwa 6th Year (Second Semester) First Examination Question [No. 18]
Which of the following descriptions regarding backfilling and compaction of earthworks is the most inappropriate?

The sandy soil used for backfilling was subjected to a particle size distribution test, and soil with a small uniformity coefficient was selected.

Reiwa 6 (2024) [Second Semester] First Examination Question [No. 19]
Which of the following descriptions regarding concrete cover thickness and spacers for reinforcing bars is the most inappropriate?
The minimum concrete cover thickness for the rising section of the strip foundation that is in direct contact with the soil was set at 30 mm.

Reiwa 6 (2024) [Second Semester] First Examination Question [No. 20]
Which of the following descriptions regarding formwork support is the most inappropriate?
Lightweight support beams were used for the slab formwork support, and the lower chord of the support beam's center was supported by pipe supports.

Reiwa 6 (2024) [Second Semester] First Examination Question [No. 21]
Which of the following combinations of joint names and diagrams in the timber work of traditional timber frame construction is inappropriate?

Reiwa 6 (2024) [Second Semester] First Examination Question [No. 22]
Which of the following descriptions regarding the demolition work of a reinforced concrete structure is the most inappropriate?

The perimeter overturning method involves first cutting all the main reinforcement bars at the base of the columns, then performing horizontal separation at the bottom of the walls and vertical separation at the ends of the walls and beams, before overturning.

Reiwa 6 (2024) [Second Half] First Examination Question [No. 23]
Which of the following descriptions regarding tile laying is the most inappropriate?
In the pressure-bonding of floor tiles, the adhesive mortar was applied in one go with a thickness of 5mm to 7mm.

Reiwa 6 (2024) [Second Half] First Examination Question [No. 24]
Which of the following descriptions regarding surface finishes for metal materials is the most inappropriate?
A finish with raised, uneven patterns on the surface of stainless steel is called a hairline finish.

Reiwa 6 (2024) [Second Half] First Examination Question [No. 25]
Which of the following descriptions regarding glass work for exterior-facing sashes is the most inappropriate?
The glazing channel joint was located at the center of the bottom edge of the glass. Reiwa 6th Year (Second Semester) First Examination Question [No. 26]
Which of the following descriptions regarding surface preparation for painting work is the most inappropriate?

The calcium silicate board surface was coated after filling holes and applying putty.

Reiwa 6th Year (Second Semester) First Examination Question [No. 27]
Which of the following descriptions regarding gypsum board installation on walls is the most inappropriate?

When attaching to a steel substrate, the heads of the drilling tapping screws were tightened so that they were flush with the board surface.

Reiwa 6th Year (Second Semester) First Examination Question [No. 28]
Which of the following descriptions regarding preliminary surveys is the most inappropriate?

When installing protective shelving, it was decided to confirm the elevation difference of the site and the location of buried underground piping.

Reiwa 6th Year (Second Semester) First Examination Question [No. 29]
Which of the following descriptions regarding temporary construction plans is the most inappropriate?

To facilitate management, a section of the materials warehouse was partitioned with non-combustible materials and set up as a storage area for paints, solvents, etc.

Reiwa 6 (2024) [Second Half] First Examination Question [No. 30]
Which of the following statements regarding notifications related to construction work is inappropriate?
A building demolition notification was submitted to the head of the Labor Standards Inspection Office in order to demolish a building with a total floor area exceeding 10 m².

Reiwa 6 (2024) [Second Half] First Examination Question [No. 31]
Which of the following statements regarding the consideration of process planning is the most inappropriate?
Milestones (management dates) in the process plan should be planned to avoid important divisions in the process.

Reiwa 6 (2024) [Second Half] First Examination Question [No. 32]
Which of the following statements regarding bar chart process charts is the most inappropriate?

The interrelationships of each task are easy to understand, and the critical path is easy to grasp.

*While every effort has been made to ensure the accuracy of points and other information within the app, please note that accuracy cannot always be guaranteed.

We assume no responsibility whatsoever for any inconvenience or disadvantage resulting from the use of this application.

*The content of the application may be added, updated, changed, or modified without prior notice.

User Growth & Download Statistics

Contact the developer

Chrome-Stats does not own this Android app. Please use these information below to contact the Android app developer.
Developed by:
ソイルプランニング
Google Play Store
https://play.google.com/store/apps/details?id=com.k2sekokan
Email:
so*****@gmail.com

Best 2級建築施工管理技士学科過去問題/令和7年1次後期~H22 Alternatives

Here are some Android apps that are similar to 2級建築施工管理技士学科過去問題/令和7年1次後期~H22: