Slab, wall, column sizes: concrete, trucks, rebar, tile. Priced takeoff PDF.
Enter three dimensions and see how much ready-mix concrete you need and how many truck loads, with a drawing of the pour. Rebar, block, brick, tile, wallpaper, paint and drywall quantities come with waste added. Each job's quantities build up into a takeoff sheet PDF with your own unit prices.
Made for site supervisors, contractors who order materials and write estimates themselves, and remodelers.
No sign-up, no ads, no internet. Everything stays on this phone. Buy once, no subscription.
■ Good to know first
· Inputs are metric (m, mm). Concrete is shown in m³ and, with a US phone, also in cubic yards (yd³). Rebar weights come out in metric tons. Quantities follow Korean practice and sizes: KS rebar D10 to D32, a standard Korean brick, and Korean wallpaper roll sizes. They are not US lumber, CMU or rebar #sizes.
· It is not structural design. Enter sections, rebar layout and spacing from the drawings.
· It does not know prices. Enter your own unit prices and it multiplies them for you.
· It does not read drawings. You type the dimensions.
· Waste factors and coverage rates are defaults from the Korean standard estimating guide and common site values. Every value can be edited, and the waste and sizes you change are kept for the next calculation.
· No account, no server, no permissions. Data stays on this phone.
■ Drawing that follows your input
The isometric drawing is scaled to your dimensions and fills with concrete from the bottom. Walls get openings, rebar is laid at your spacing, and dimension lines carry your numbers so typos show.
■ Takeoff sheet PDF with drawings
· Your company name, contact and phone at the top (set once in Settings)
· Material totals with unit price and amount columns, and a grand total
· Concrete by pour: m³ and truck count for each pour group (first pour, second pour)
· Prepared-by and checked-by boxes
· Appendix: the same drawing as the screen for every member, with inputs, notes and the calculation shown
Share it by message, email or chat, or save it. CSV export is there for spreadsheets.
■ Concrete
· Slab, wall (minus doors and windows), column (square or round, times count), beam, spread footing, strip footing, stairs
· Net volume, then waste (default 1% reinforced, 2% plain), then order quantity and truck count (6 m³ default, editable) with the last truck's load
· Pour groups: label members "1st pour" or "2nd pour" and each group counts its own trucks
■ Formwork area
Shown together with the concrete: slab edges and soffit, wall faces and ends, column perimeter, beam sides and bottom, footing sides, stair soffit and risers. Contact area only, no waste. Switch it off if you do not need it.
■ Rebar
· KS D 3504 nominal unit weights (D10 0.560 to D32 6.23 kg/m)
· By length and count, or by slab size and spacing (@200 and so on)
· Lap and anchorage allowance, waste, then kg, tons and stock bars (8 m and so on)
■ Masonry and finishes
· Block: 390 × 190 with a 10 mm joint, waste 4%
· Brick: standard Korean brick in 0.5B to 2.0B walls
· Tile: size, joint, waste, then pieces and boxes with the leftover count
· Wallpaper: narrow and wide rolls or your own size, pattern repeat and trim, then strips and rolls
· Paint: area × coats ÷ coverage, in liters and cans
· Drywall and insulation: board size and layers, then sheets
■ Your prices, your amounts
Tap "Add prices" in the totals and every material of the job gets a price field. Only materials you price get an amount; the app never adds market prices. The same price is reused on every job.
■ Job takeoff, reference values, large text
· Label each calculation (Level 2 slab, wall A) and the job totals add up on their own. Saved entries keep the values at that time, so changing defaults never rewrites a past sheet.
· Edit the truck size, rebar unit weights, bricks per m² and all waste defaults.
· Backup is one file with jobs, entries, prices and header; restore it on a new phone.
No ads. No in-app purchases. Buy once.
Contact: gone1005@gmail.com