QuickPlan – Project Gantt Plan is a privacy-focused, iPhone-only app that delivers gesture-driven Gantt chart project management for small screens. User-created projects can be stored on-device or in iCloud Drive, with sync across devices and sharing with teammates. It supports importing from and exporting to Microsoft Project XML, WBS, Mindmap, and Excel.

Designed for speed and ease of use, QuickPlan offers tree and list views, gesture-based task management, customizable fields, and flexible export options (image, PDF, Excel). A macOS app is available with a free 15-day trial; there are separate apps for iPhone and iPad, and sharing is simple via AirDrop, OneDrive, and Dropbox.

User Growth & Download Statistics

By:
皓 李
Rating:
4.70
(401)
1 new ratings
Version:
17.3 Last updated: 2026-05-17
Version code:
885693005
Creation date:
2013-10-20
Compatible devices:
Size:
193.69MB
Price:
8.99
URLs:
Website ,Privacy policy
Full description:
See detailed description
Source:
Apple Apps Store
Data ingested on:
2026-09-06
Compare stats and ranking:

Contact the developer

Chrome-Stats does not own this Apple app. Please use these information below to contact the Apple app developer.
Developed by:
皓 李
Apple Apps Store
https://apps.apple.com/us/app/quickplan-project-gantt-plan/id699434089
Website:
https://quickplan.app/apps/quickplan-iphone

User Reviews

Reviews praise QuickPlan for its clean, intuitive UI and mobile-friendly Gantt capabilities, plus solid value as a one-time purchase. The main downsides are inconsistent syncing across devices and fragmented platform availability (separate iPhone/iPad versions with different pricing). Some users also wish for better collaboration and cross-platform sharing. Overall, a capable, user-friendly mobile PM tool that could be improved with reliable cloud sync and clearer cross-device support.
Pros
  • Intuitive, elegant UI that's easy to use on mobile.
  • Strong mobile usability across iPhone and iPad for on-the-go planning.
  • Powerful Gantt-style scheduling and project management that works well on a mobile device.
  • Good value as a one-time purchase.
Cons
  • Poor cross-device syncing: local files with manual cloud exports and no true multi-device sync.
  • Fragmented platform availability: separate iPhone and iPad versions with different pricing and patchy support.
  • Limited collaboration and cross-platform compatibility; unclear how it shares work with others.
Recent reviews
Would have been five star if has syncing. When you create a file. That file is in the local app of that device. It’s not synced to another device. Not in iCloud either. You have to export it into iCloud manually. And then you think the changes would just reflect in the iCloud file right? Nope. The iCloud file is a copy of the in-app file. So when you open the file in iCloud on another device, it would be the version of the file at the moment you exported it. And you would have two copies on two separate devices. Sounds confusion right? Because it is. It’s basically the same saving and syncing mechanism from early 2010s, but without the save button beyond export. Workaround for syncing: 1. Make sure you export the file to iCloud when you done working or viewing a project on each device, and export the file to replace the old file. 2. Close the app after you have exported, as your edit won’t then be saved on the iCloud copy. 3. When you open that file on another device, it creates a local in-app file. You are no longer working with the iCloud file. So export and replace the iCloud file afterwards, and close the in-app file, so that you don’t accidentally mistaken it as the newest version when you have worked on another copy of the file on another device. In 2026, this is still how the “syncing” mechanism of this works. Tell me if I’m missing anything. I assume it’s not a difficult fix, to just have one source of truth. Otherwise the app has been great. But the lack of syncing, or even saving creates too much risk in the PM work.
by Da*****, 2026-02-15

I need control over duration units
by He*****, 2025-06-07
View all user reviews ›

Best QuickPlan - Project Gantt Plan Alternatives

Here are some Apple apps that are similar to QuickPlan - Project Gantt Plan: