Makely: DIY Project Planner Apple

Makely: DIY Project Planner

Turn DIY videos into projects
Looking to download Instagram videos? Try:

Overview

Version:
1.0.2
Last updated: 2026-07-11
Ranking
#1,699,637 ▼ 14,056
Overall

Features & Capabilities

New: Fix It — snap a leak, crack, or broken fixture and get a step-by-step repair plan. Build a project from any photo. Earn badges as you finish.

Stop pausing, rewinding, and squinting at someone else's hands. Makely turns any DIY video, photo, or problem into a real, organized project — with the exact materials, tools, and step-by-step plan you need to build it.

WHAT MAKELY DOES

  • Save any DIY video, in one tap. See a reel, short, or pin on Instagram, TikTok, YouTube, or Pinterest? Tap Share → Makely. Open the app and your project is extracted automatically.
  • Materials & steps, figured out for you. AI watches the video and pulls out every material, tool, measurement, and instruction — including exact brand names when they're visible on the label.
  • Any how-to article, decoded. Paste a link to a blog or DIY site and Makely lifts the materials, tools, and steps into a clean, editable project.
  • Snap a photo, get a plan. Point your camera at a piece of furniture, a room, or a finished project and Makely drafts the whole build.
  • Something broken? Fix It. Describe the problem or photograph it — a leaking pipe, a cracked tile, a broken hinge. Makely asks a couple of questions, diagnoses it, and turns the answer into a repair plan with a shopping list. It flags hazards and tells you when to call a licensed pro.
  • Stuck for ideas? Ask Makely. Describe what you want to build — "a floating walnut desk," "raised garden beds for a 4x8 plot" — and Makely drafts a full materials list and plan in seconds.
  • Smart shopping lists. Check off materials as you shop and see what you've already bought.
  • Find materials online. Tap any material or tool to search for it on Amazon.
  • Project Mode. Hands-free, step-by-step instructions with the actual video clip for each step — pause, replay, slow down, or go fullscreen while your hands are busy.
  • Stay organized, stay motivated. Build collections for the kitchen remodel, the garden upgrade, the bathroom refresh. Track what you own, what you need, and the rough cost. Earn badges as you finish projects.

MAKELY PRO

Makely is free to download — start with 3 free project extractions to try the magic. Makely Pro unlocks 100 Magic Links every month (up to 30 a day), longer video support, and all Pro features, starting with a 7-day free trial:

  • Makely Pro Monthly: $7.99
  • Makely Pro Annual: $59.99 (save 37%)

Payment will be charged to your Apple ID account at the confirmation of purchase. Subscriptions automatically renew unless canceled at least 24 hours before the end of the current period. Your account will be charged for renewal within 24 hours prior to the end of the current period. You can manage and cancel your subscriptions at any time in iOS Settings → Apple ID → Subscriptions. Any unused portion of the free trial will be forfeited when you purchase a subscription.

IMPORTANT

Makely's plans are AI-generated. Always verify materials, measurements, and safety before you build. For gas, electrical, structural, or major water work, consult a licensed professional.

As an Amazon Associate, we earn from qualifying purchases at no extra cost to you.

Privacy Policy: https://sites.google.com/view/makely/privacy-policy Terms of Use: https://sites.google.com/view/makely/terms-of-use Questions? renvapp@gmail.com

User Growth & Download Statistics

App
By:
Saidmuhammad Brjanov
Version:
1.0.2 Last updated: 2026-07-11
Version code:
888127263
Creation date:
2026-06-01
Compatible devices:
Size:
23.98MB
URLs:
Website ,Privacy policy
Full description:
See detailed description
Source:
Apple Apps Store
Data ingested on:
2026-09-22
Compare stats and ranking:

Contact the developer

Chrome-Stats does not own this Apple app. Please use these information below to contact the Apple app developer.
Developed by:
Saidmuhammad Brjanov
Apple Apps Store
https://apps.apple.com/us/app/makely-diy-project-planner/id6772721789
Website:
https://sites.google.com/view/makely

Best Makely: DIY Project Planner Alternatives

Here are some Apple apps that are similar to Makely: DIY Project Planner: