Crafti: Craft Project Planner Apple

Crafti: Craft Project Planner

By: Daniel Kim App
Save DIY Tutorials & Supplies
Looking to download Instagram videos? Try:

Overview

Version:
1.0.4
Last updated: 2026-07-24
Ranking
#1,685,954 ▼ 13,981
Overall

Features & Capabilities

Paste a craft video or blog link and AI pulls out the whole project - tools, materials, and every step. Plan your makes and build your supply list in one place.

Crafti turns the craft tutorials you love into projects you actually finish.

See a knitting pattern on YouTube, a crochet reel on Instagram, a woodworking build on TikTok, or a jewelry idea on Pinterest? Paste or share the link and Crafti's AI instantly pulls out the whole project - the tools and materials, step-by-step instructions, time estimate, and difficulty level - and saves it as a project you can make.

WHY MAKERS LOVE CRAFTI

  • Import from anywhere: any video or craft blog link becomes a clean, organized project in seconds.
  • Everything in one place: sort projects into collections, mark favorites, and filter by craft type and difficulty from beginner to expert.
  • Plan your making time: drop projects onto a weekly, monthly, or list planner and drag to reschedule.
  • Never buy twice: Crafti auto-builds a shopping list of tools and supplies from your projects and merges duplicates for you.
  • Make hands-free: follow mode walks you through each step so your hands stay on your work.

BUILT FOR EVERY CRAFT Knitting, crochet, sewing, quilting, woodworking, paper craft, jewelry making, macrame, cross stitch, resin, and every DIY project in between.

FREE TO START Crafti is free to use. Optional Premium unlocks unlimited AI imports for makers who save a lot.

Stop losing tutorials in your bookmarks. Import it, plan it, shop for it, and make it - all in Crafti.

User Growth & Download Statistics

App
By:
Daniel Kim
Version:
1.0.4 Last updated: 2026-07-24
Version code:
888651897
Creation date:
2026-05-24
Compatible devices:
Size:
81.59MB
URLs:
Privacy policy
Full description:
See detailed description
Source:
Apple Apps Store
Data ingested on:
2026-09-21
Compare stats and ranking:

Contact the developer

Chrome-Stats does not own this Apple app. Please use these information below to contact the Apple app developer.
Developed by:
Daniel Kim
Apple Apps Store
https://apps.apple.com/us/app/crafti-craft-project-planner/id6771215487

Best Crafti: Craft Project Planner Alternatives

Here are some Apple apps that are similar to Crafti: Craft Project Planner: