AOM for TMA Android

AOM for TMA

AOM from Laminaar Aviation Infotech is an extension of the ARMS® Suite.

Features & Capabilities

The latest Mobile app from Laminaar Aviation Infotech Pvt. Ltd. is an extension of the ARMS® Suite. A state-of-the-art mobility solution that offers Airlines and Air Operators access to various Crew specific information from various sub- systems of the ARMS® Suite. Mobile app provides data to end-users in real time, as well as in offline mode. The same app can also enable the use of rapidly proliferating "Mobile Smartphone Devices" for other functions as well, e.g., for Cabin Crew, Engineering Crew, Load Masters and Ground staff etc., all controlled by a unified Backend Server infrastructure.
“AOM for TMA”- comprises the Server-side components and the Mobile-side (Client) application. The other big advantage of “AOM for TMA” is that it is an integral part of the ARMS® Suite; which means it can seamlessly integrate with all the other sub-systems of ARMS® Suite thereby offering a truly integrated end-to-end Mobility solution.

User Growth & Download Statistics

App
By:
Laminaar Aviation Infotech
Downloads:
59
Version:
2.4.5 Last updated: 2023-04-11
Version code:
121
Creation date:
2022-12-21
Publisher country:
IN IN
Permissions:
  • android.permission.GET_ACCOUNTS Very high risk
  • android.permission.READ_CONTACTS Very high risk
  • android.permission.READ_PHONE_NUMBERS Very high risk
  • android.permission.READ_PHONE_STATE Very high risk
  • android.permission.AUTHENTICATE_ACCOUNTS High risk
  • android.permission.MANAGE_DOCUMENTS High risk
  • android.permission.READ_CALENDAR High risk
  • android.permission.READ_EXTERNAL_STORAGE High risk
  • android.permission.USE_CREDENTIALS High risk
  • android.permission.WRITE_CALENDAR High risk
  • See more
Size:
20.52MB
Email:
ao*****@laminaar.group
URLs:
Website ,Privacy policy
Full description:
See detailed description
Source:
Google Play Store
Data ingested on:
2026-06-04
Compare stats and ranking:

Contact the developer

Chrome-Stats does not own this Android app. Please use these information below to contact the Android app developer.
Developed by:
Laminaar Aviation Infotech
Google Play Store
https://play.google.com/store/apps/details?id=com.armsproject.aom
Email:
ao*****@laminaar.group
Website:
https://www.laminaar.com/

Best AOM for TMA Alternatives

Here are some Android apps that are similar to AOM for TMA: