FixCalc: Material Calculator Apple

FixCalc: Material Calculator

Paint, Tile & Flooring Costs

Overview

Features & Capabilities

All calculators free. Save 3 estimates in 1 project. FixCalc Pro Lifetime adds unlimited projects and PDF export. One purchase, no subscription. Watch stays free.

Plan paint, tile, and flooring before a store run. FixCalc turns room measurements, package coverage, waste, and prices into material quantities, package counts, and cost estimates. Use regional units, shopping checkmarks, and text sharing.

All calculators and full results remain free. Save up to three estimates in one project and edit their existing details for free. Moving an estimate into a second project requires Pro.

Introducing FixCalc Pro Lifetime: unlock unlimited projects and saved estimates plus shopping-list PDF export with one purchase, no subscription.

Keep using the Apple Watch calculator for free.

Project data stays on your device. FixCalc uses aggregate analytics with no cross-app tracking. No account or ads.

Restore Purchases is available in the Pro screen. Eligible early adopters keep Pro access.

User Growth & Download Statistics

App
By:
Dmitry Alaev
Version:
1.5 Last updated: 2026-09-20
Version code:
891150967
Creation date:
2026-08-04
Compatible devices:
Size:
14.71MB
URLs:
Website ,Privacy policy
Full description:
See detailed description
Source:
Apple Apps Store
Data ingested on:
2026-09-22
Compare stats and ranking:

Contact the developer

Chrome-Stats does not own this Apple app. Please use these information below to contact the Apple app developer.
Developed by:
Dmitry Alaev
Apple Apps Store
https://apps.apple.com/us/app/fixcalc-material-calculator/id6778463977
Website:
https://www.bad-monkey.biz/

Best FixCalc: Material Calculator Alternatives

Here are some Apple apps that are similar to FixCalc: Material Calculator: