Overview

Version:
1.2
Last updated: 2026-02-12
Ranking
#1,534,675 ▼ 6,193
Overall

Features & Capabilities

takt. A visual grid based timer, with haptic controls and an LED grid.

Inspired by the legendary the iconic T3 pocket radio, takt Timer reimagines industrial design history as a modern productivity tool.

Forget complex menus and digital clutter. Rotate the precision haptic dial to set your time. Feel every click. Watch the iconic LED grid illuminate, and pulsing gently as seconds fade away.

Features:

Tactile Control - A hyper-realistic haptic dial that makes setting the time feel physical.

The Grid - Experience the classic T3 aesthetic with backlit LEDs that pulse and fade.

Flexible Timing - Switch between Seconds or Minutes modes.

Modern Integration - Dynamic Island support and a beautiful Lock Screen Widget.

Unlock takt+ with a one time in-app purchase:

Total Customization - Choose from 4 bespoke themes, 5 dial styles, 9 vibrant LED colours, 9 custom alarms and more.

New grid sizes - Supports 8x8 (64 units), 10x10 (100 units), and 11x11 (121 units) grids.

Soundscapes - 9 custom-made alarm sounds designed to be noticed, not annoying.

Turn time into art. Download Takt Timer today.

User Growth & Download Statistics

App
By:
Jack Lear
Version:
1.2 Last updated: 2026-02-12
Version code:
881504936
Creation date:
2026-02-12
Compatible devices:
Size:
5.07MB
URLs:
Website ,Privacy policy
Full description:
See detailed description
Source:
Apple Apps Store
Data ingested on:
2026-09-01
Compare stats and ranking:

Contact the developer

Chrome-Stats does not own this Apple app. Please use these information below to contact the Apple app developer.
Developed by:
Jack Lear
Apple Apps Store
https://apps.apple.com/us/app/takt-timer/id6757820785
Website:
http://www.jacklear.com/takt/

Best Takt Timer Alternatives

Here are some Apple apps that are similar to Takt Timer: