Subwoofer Bass Booster Android

Subwoofer Bass Booster

Feel the POWER of the BASS with this easy to use BASS BOOSTER!!!

Features & Capabilities

Subwoofer Bass Booster is a powerful yet simple Chrome extension designed to enhance your audio experience by boosting bass frequencies. With an intuitive slider, you can adjust the bass level to your preference and enjoy richer, fuller sound directly within your browser. For the best results, it is recommended to use external speakers or headphones.

Note that for optimal performance, other equalizer apps should be disabled as they may interfere with the bass enhancement. Restart your device to ensure Subwoofer Bass Booster works without conflicts. Experience the power of deep, clear bass with this easy-to-use extension—perfect for music lovers seeking that extra punch!

User Growth & Download Statistics

App
By:
VIZ Soft AD
Downloads:
3,735,592 176
Rating:
4.39
(31,667)
33 ratings
Version:
2.1 Last updated: 2022-06-08
Creation date:
2014-04-06
Publisher country:
BG BG
Email:
vi*****@gmail.com
URLs:
Website ,Privacy policy
Full description:
See detailed description
Source:
Google Play Store
Data ingested on:
2026-07-13
Compare stats and ranking:

Ranking

Contact the developer

Chrome-Stats does not own this Android app. Please use these information below to contact the Android app developer.
Developed by:
VIZ Soft AD
Google Play Store
https://play.google.com/store/apps/details?id=com.vizSoft.bassBooster
Email:
vi*****@gmail.com
Website:
https://vizsoft-ad.com

User Reviews

Users praise the app for strong bass enhancement, powerful speaker output, and generally positive performance/ratings. The main recurring complaint is intrusive, frequent advertising (notably a long Lazada video ad). Overall sentiment is favorable for audio improvement despite ad-related annoyance.
Pros
  • Noticeably boosts bass and overall sound quality
  • Enhances speaker output — users call it powerful or a good speaker booster
  • Consistently positive user satisfaction (many short reviews rate it 'good', 'great', or 5 stars)
Cons
  • Intrusive and frequent ads (multiple complaints, including a long Lazada video ad that blocks use)
Recent reviews
nice sound with smooth beat on all songs genre
by Mo*****, 2026-04-17

Great 👍
by Ma*****, 2025-09-21

full of ads
by He*****, 2025-09-04
View all user reviews ›

Best Subwoofer Bass Booster Alternatives

Here are some Android apps that are similar to Subwoofer Bass Booster: