VoltSound Android

VoltSound

By: Luniryx
Create your own soundboard and add your favorite sounds with VoltSound.

Features & Capabilities

VoltSound — Your Soundboard, Your Audio Universe

With VoltSound, create a fully customized soundboard that reflects your style.
Add your own sounds, organize them your way, and craft a unique audio experience. Whether it’s for fun, streaming, gaming, or creative projects, VoltSound gives you total control over your sound world.

Create, organize, and play your sounds with ease
Turn your phone into an interactive sound studio:
- Add your personal audio files (MP3, WAV, and more)
- Create categories of soundboards (Memes, Gaming, Music, etc.)
- Change the visual theme to match your vibe (light, dark, neon, etc.)
- Play multiple sounds at once or loop them
- Customize the name, color, and icon of every button.
Everything is designed to be simple, fast, and smooth, with no intrusive ads.

A modern and adaptable design, VoltSound adapts to your universe:
- A clean, modern interface, inspired by neon and electric visuals
- Dynamic themes that evolve with each soundboard
- An immersive experience whether you’re a creator, streamer, or sound lover

Your personal sound space

VoltSound is your personal space: everything you want, organized your way.
Each button, each effect, and each sound can be edited, renamed, and styled as you like.

Simple for everyone, powerful for creators

Whether you’re a beginner or an experienced creator, VoltSound gives you the essential tools to express your sound creativity.
No limits, no account required — your soundboard truly belongs to you.

VoltSound — Bring your audio universe to life.
Download VoltSound now and start creating your custom soundboard today.
Unleash your imagination — every sound becomes an experience.

User Growth & Download Statistics

App
By:
Luniryx
Downloads:
23
Version:
1.0.0 Last updated: 2025-11-19
Version code:
4
Creation date:
2025-11-19
Publisher country:
FR FR
Permissions:
  • android.permission.RECORD_AUDIO Very high risk
  • android.permission.READ_EXTERNAL_STORAGE High risk
  • android.permission.READ_MEDIA_AUDIO High risk
  • com.google.android.gms.permission.AD_ID Moderate risk
  • android.permission.ACCESS_ADSERVICES_AD_ID Low risk
  • android.permission.ACCESS_ADSERVICES_ATTRIBUTION Low risk
  • android.permission.ACCESS_ADSERVICES_TOPICS Low risk
  • android.permission.FOREGROUND_SERVICE Low risk
  • android.permission.INTERNET Low risk
  • android.permission.POST_NOTIFICATIONS Low risk
  • See more
Size:
73.77MB
Email:
co*****@luniryx.com
URLs:
Website ,Privacy policy
Full description:
See detailed description
Source:
Google Play Store
Data ingested on:
2026-06-14
Compare stats and ranking:

Contact the developer

Chrome-Stats does not own this Android app. Please use these information below to contact the Android app developer.
Developed by:
Luniryx
Google Play Store
https://play.google.com/store/apps/details?id=com.luniryx.voltsound
Email:
co*****@luniryx.com
Website:
https://luniryx.com/

Best VoltSound Alternatives

Here are some Android apps that are similar to VoltSound: