SiteDiary Pro - Logs to Gantt Android

SiteDiary Pro - Logs to Gantt

Construction daily report & automatic Gantt project tracker for supervisors.

Overview

Features & Capabilities

SiteDiary Pro is the construction site diary (daily log) and project scheduling app built for site managers, foremen, and contractors who need one place to log daily progress and track it against the master construction program.

Stop juggling paper diaries and logs, spreadsheets, and separate scheduling software. SiteDiary Pro links your daily site log directly to a live construction schedule, so every diary entry you log automatically updates project progress, production rates, and cost tracking — with no manual re-entry.

WHY SITE TEAMS CHOOSE SITEDIARY PRO

📋 DAILY SITE DIARY / CONSTRUCTION LOG
• Capture weather (auto-fetched or manual), deliveries, visitors, unusual events, and daily notes
• Log Engineer Instructions and RFIs with structured, searchable action logs
• Track delays with duration impact and cause, straight into your delay register
• Record plant, labour, and material resource usage against each activity

📊 GANTT CHART & CRITICAL PATH SCHEDULING
• Interactive, drag-to-scroll Gantt chart with tablet split-pane view
• Finish-to-start dependency logic — successor activities shift automatically
• Working-day aware scheduling (Mon–Fri, Mon–Sat, or 7-day calendars)
• One-tap Critical Path Method (CPM) overlay to instantly see which activities have zero slack and are driving your completion date
• Track up to 250 activities per project

📈 PRODUCTION & COST ANALYTICS
• Automatic Unit Economic Rate (cost per unit produced)
• Daily and cumulative production rate tracking
• Total expenditure calculated live from resource rates and quantities

🗂 MULTI-PROJECT MANAGEMENT
• Run multiple job sites from one app with full historical diary navigation per project
• Unlimited plant, labour, and material resource registration

☁️ OFFLINE-FIRST WITH CLOUD SYNC
• Full functionality without signal on remote construction sites
• Background sync keeps your records backed up and available across devices

📄 PROFESSIONAL PDF REPORTS
• Export site diary / log and Gantt reports as clean, print-ready PDFs
• Critical path highlighted for client and stakeholder reporting

WHO IT'S FOR
Site agents, foremen, project managers, quantity surveyors, and small-to-mid-size contractors who need bulletproof, auditable daily records tied to a real schedule — not a static spreadsheet.

PRICING & FREE TRIAL
SiteDiary Pro offers a 14-day free trial (1 project). After the trial:
• Standard: up to 5 concurrent projects
• Pro: unlimited concurrent projects
Subscriptions are billed via Google Play and renew automatically unless cancelled at least 24 hours before the renewal date. Manage or cancel anytime in your Google Play account subscription settings. Local pricing may vary by region.

Download SiteDiary Pro and turn your daily construction site log into a live, auditable project schedule.

User Growth & Download Statistics

App
By:
Horizon Forge
Downloads:
6 5
Version:
1.0.0 Last updated: 2026-07-09
Version code:
29
Creation date:
2026-07-04
Publisher country:
ZA ZA
Permissions:
  • android.permission.INTERNET Low risk
  • com.android.vending.BILLING Low risk
  • android.permission.ACCESS_NETWORK_STATE Safe
  • com.android.vending.CHECK_LICENSE Safe
  • com.horizonforge.sitediarypro.DYNAMIC_RECEIVER_NOT_EXPORTED_PERMISSION
Size:
8.61MB
Email:
sh*****@gmail.com
URLs:
Website ,Privacy policy
Full description:
See detailed description
Source:
Google Play Store
Data ingested on:
2026-07-21
Compare stats and ranking:

Contact the developer

Chrome-Stats does not own this Android app. Please use these information below to contact the Android app developer.
Developed by:
Horizon Forge
Google Play Store
https://play.google.com/store/apps/details?id=com.horizonforge.sitediarypro
Email:
sh*****@gmail.com
Website:
https://horizonforgeapps.github.io/SiteDiary-Pro/

Best SiteDiary Pro - Logs to Gantt Alternatives

Here are some Android apps that are similar to SiteDiary Pro - Logs to Gantt: